Showing 2 of 211 source records
Public Community Meeting #1 · July 8, 2026This is connected to the Millennium Power plant and other solar infrastructure, and it is close to Cady Brook and the nature preserve. A fire could affect the sanctuary, the storage facilities, and the power plant at the same time. You need protections around those areas.
We have noted this recommendation. Our containment design is built to keep an incident to a single battery unit; in the US record, fires at the older Megapack sites stayed within one or two units. Our site plan will fully account for adjacent properties, including the power plant, the energy storage facilities, and the nature preserve.
How the issues were handled
A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.
How close is it to Cady Brook? Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Charlton already has solar, a power plant, gas storage. Why add this? Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Were the road and utility upgrades done for this project? Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Community Public Forum · September 30, 2026Were the road and utility upgrades near the site done for this project?
No. National Grid planned and carried out those upgrades for future use, and not for this project. National Grid does have to approve our connection, and it studies whether we can connect safely under its standards.
How the issues were handled
A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.
Were the road and utility upgrades done for this project? Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.