Public Community Meeting #1 · July 8, 2026We had no choice [with the LNG plant]. They just said, we hear what you are saying, but it is too bad, it is coming anyway.

Earlier published response

We understand your frustration and respect the town's history with past infrastructure decisions. Siting battery storage systems under the 2024 Climate Act (Chapter 239) consolidates permitting under the state's Energy Facilities Siting Board (EFSB) rather than local municipal boards. However, the regulations require developers to conduct meaningful engagement before filing: informing residents, gathering input, and documenting how that input was incorporated into the project. The pre-filing period is the best time to shape the project because the design is still open. When community input leads to a design change, such as a visual setback or a safety measure, we record it in the public Commitment Tracker on this site and carry it into the plans we file with the state. We are also required to pursue a Community Benefits Plan with the town, and that process is where broader benefit topics get worked out together. The state review itself also gives residents formal standing. When the project files with the EFSB, residents can comment on the record, and community groups, nonprofits, and the town can ask the Siting Board for intervenor status, which makes them full parties to the case. The same 2024 law created the Intervenor Support Grant Program to fund that participation. It pays intervenor groups up to $150,000 per proceeding for attorneys, expert witnesses, and other participation costs, and it covers proceedings that begin on or after July 1, 2026, which includes the future review of this project.

How the issues were handled

A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.

  • Charlton already has solar, a power plant, gas storage. Why add this?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Public Community Meeting #1 · July 8, 2026This is connected to the Millennium Power plant and other solar infrastructure, and it is close to Cady Brook and the nature preserve. A fire could affect the sanctuary, the storage facilities, and the power plant at the same time. You need protections around those areas.

Earlier published response

We have noted this recommendation. Our containment design is built to keep an incident to a single battery unit; in the US record, fires at the older Megapack sites stayed within one or two units. Our site plan will fully account for adjacent properties, including the power plant, the energy storage facilities, and the nature preserve.

How the issues were handled

A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.

  • How close is it to Cady Brook?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Charlton already has solar, a power plant, gas storage. Why add this?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Were the road and utility upgrades done for this project?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Community Public Forum · September 30, 2026The area already has a power plant, gas storage, a landfill, and an impaired brook. Is this project too much?

Earlier published response

The state looks at this directly. The census block group around the site scores 80.9 out of 100 on the state's burden measure, and anything over 75 is considered burdened. Drivers include the power plant, the gas storage, a closed landfill, a small spill, and the impaired Cady Brook. Our aim is for the project to add no burden, or to help reduce it. That is part of why the Community Benefits Plan exists.

How the issues were handled

A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.

  • Charlton already has solar, a power plant, gas storage. Why add this?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Community Public Forum · September 30, 2026Is there a lot of solar in town already? Why add this?

Earlier published response

Each project is considered on its own merits, and we take cumulative burden into account. It is high for this census block. Storage is different from solar: it does not produce new power, but makes more efficient use of power already on the grid.

How the issues were handled

A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.

  • Charlton already has solar, a power plant, gas storage. Why add this?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Website and email · July 15, 2026, 6:56 AM ETWhy Charlton. We have lost a lot of land to Amazon, construction and solar projects to mention a few. We can't afford to lose space to a project that would further damage the environment. Why Charlton

Earlier written draft (answers as of October 7, 2026)

Charlton was not chosen so much as the Carpenter Hill Substation was. The 345 kV and 115 kV transmission lines meet there, and it connects eastern and western Massachusetts. Because the project connects at an existing substation, it needs only a short line to the substation and no new long-distance transmission.

Each project is considered on its own merits, and cumulative burden is taken into account. The burden is high for this census block. A cumulative impact analysis is part of the state process and will become part of the public record. If the project is built, tree clearing outside the existing New England Power (National Grid) transmission right-of-way is committed at no more than 10 acres, on a 47-acre parcel.

How the issues were handled

A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.

  • Will it change the rural character, views, and quiet?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Why Charlton, and why this site?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Charlton already has solar, a power plant, gas storage. Why add this?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.