Question and Submission History

Original questions and earlier responses, linked to the consolidated answer bank.

Back to questions and answers

This history preserves the anonymized wording and earlier written responses in the imported project records. Earlier responses may describe a previous design or contain wording now under review. Use the linked consolidated question for the current response status.

A source record can contain several questions. These records are not a count of individual submissions or people. Original messages and dates are still being reconciled; this history does not establish that every project submission has been captured.

Showing 4 of 211 source records

Website and email · July 6, 2026, 5:56 PM ETWhat are the cooling needs of this facility and how will it affect the water table and environment.

Earlier written draft (answers as of October 7, 2026)

Carpenter Hill Power is a battery storage facility, not a power plant that needs a continuous supply of water to generate electricity. Each battery unit has its own liquid cooling system. The project is not expected to need an ongoing supply from Charlton's drinking water system for normal operation. Cooling and water use details have not been published. The hydrology and stormwater studies are committed and will be published, and a groundwater monitoring program is committed.

How the issues were handled

A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.

  • Will the facility use local water or change the water table?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Website and email · September 10, 2026, 9:13 AM ETWater- Facilities like this one are known to use and pollute large quantities of water. Charlton, MA has a history of pollutants in the water and some difficulty maintaining clean water. What specific methods do you have to ensure you do not take water from the local community and that it stays clean through construction and beyond? How will you compensate the neighborhood of Carpenter Hill Road and other residents of Charlton, MA if you negatively impact water supply, electricity costs, or accessibility? "Negatively impact" to be defined by the Charlton, MA community.

Earlier written draft (answers as of October 7, 2026)

Keeping the water supply and its quality protected. Normal operation is not expected to draw on the town's drinking water. Plans for erosion control, stormwater management, and groundwater monitoring are being developed. Spill containment is planned, and firefighting water is to be captured on site, not released to groundwater or drainage areas. The detailed hydrology and stormwater studies are still being completed and will be made available when they are.

Compensation. The draft Community Benefits Plan proposes that the project pay to test eligible private wells within 1,000 feet of the work limit, and that if a test shows a change linked to the site, the project pay for bottled water within 48 hours and for treatment or a replacement well. This is a draft and not yet a commitment. No promise has been made on electricity costs or accessibility. The draft plan is the place to define what counts as a negative impact, and comments on it are open into 2027.

How the issues were handled

A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.

  • Will the facility use local water or change the water table?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Website and email · October 2, 2026, 10:36 PM ETWe are deeply concerned about the potential effects of this development on our groundwater, drinking-water safety, property values, local infrastructure, and overall quality of life. Before the project proceeds, the community needs clear, independently verified information about its anticipated water use, wastewater management, stormwater controls, chemical storage, emergency-response plans, and potential impacts on nearby wells and aquifers. These concerns should be addressed through a transparent, independent environmental review based on site-specific data, including baseline groundwater testing, a comprehensive assessment of contamination risks, and a plan for ongoing monitoring. Any approval should include enforceable safeguards, financial assurances for cleanup and remediation, and clear accountability if the project causes environmental or economic harm. We are also concerned that the current process has not provided residents with a meaningful opportunity to review the project's impacts, obtain complete information, and participate in decisions that could permanently affect our homes and community. Public notice, accessible records, independent technical review, and adequate opportunities for public comment are essential. In addition, residents need assurance that the developer will remain financially and legally responsible for the project's long-term impacts. If the developer leaves, changes ownership, or ceases operations, the town should not be left responsible for monitoring, infrastructure costs, environmental remediation, or losses in property value. We believe the project may be relying on gaps or limitations in the existing regulatory process rather than addressing the full range of community concerns. Regardless of how the project is being permitted, compliance with minimum requirements should not replace a thorough evaluation of cumulative environmental, economic, and public-health risks. We oppose this development in its current form. We expect our concerns to be addressed with specific evidence, independent analysis, enforceable protections, and a meaningful role for the residents who will be affected. The long-term interests of our community must take priority over the project's approval.

Earlier written draft (answers as of October 7, 2026)

Water use, wastewater, and chemical storage. Water use details have not been published. The facility is not a power plant and is not expected to need an ongoing supply from the town's drinking water for normal operation. Wastewater and chemical storage information has not been published. The only significant liquid in each battery unit is the coolant in its cooling system, and the coolant type has not been specified. The hydrology and stormwater studies are committed and will be published.

Stormwater, wells, and aquifers. The design being developed uses basins sized for storm events, with a commitment to no net increase in runoff and no wetland fill. A hydrogeologic study with a well inventory is underway. The draft Community Benefits Plan proposes testing wells within 1,000 feet of the work limit, with baseline testing before construction and retesting during and after it.

Emergency response. The Emergency Action Plan is being built with Charlton Fire and will be reviewed by an independent reviewer the town selects and the project pays for. It is not published yet.

Independent review and monitoring. The Energy Facilities Siting Board conducts the state review, which includes public hearings and environmental review. An independent third-party review of the Emergency Action Plan is committed. A separate independent review of the groundwater study has not been committed. Groundwater monitoring at the site is committed, with its terms in writing before construction. The state's Intervenor Support Grant Program, up to $150,000 per group for each proceeding, can pay for expert witnesses.

Financial assurance and accountability. A decommissioning bond is required before construction and stays with the project through any change of ownership. Pollution liability insurance is to be carried during construction and operation, and Massachusetts law keeps cleanup responsibility with the site's owner. Permit conditions bind any future owner. The decommissioning bond covers removal and restoration so the cost does not fall to the town.

The process. The project is in the state's required pre-filing engagement phase, with public meetings, a Citizen Advisory Committee, published records, and a comment period on the draft Community Benefits Plan that runs into 2027. Every comment receives a written response. A cumulative impact analysis, which looks at what is already in the area, is part of the state process and is in preparation.

How the issues were handled

A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.

  • How can residents participate and get funding or expert help?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Will anyone independent review it?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Has the combined effect of everything in the area been studied?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Will the emergency plan be independently reviewed and public?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Will my well be tested, and who pays if it changes?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Will the facility use local water or change the water table?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Has a hydrogeologic study been done?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Will property values go down?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • How do we know a new owner will keep the promises?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Who pays to remove the batteries and restore the site?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Website and email · September 10, 2026, 8:30 AM ETI truly believe building the data center will make Charlton an unlivable place. It will cause air and light pollution, water waste, very unnecessary noise, everyone will be paying a higher tax for this and no one even wants it. The response I'm assuming a lot of people are getting when they says data center is it is not a data center but as other documents, people post from out of state where they build these things proves it starts off as an energy storage and becomes a data center. I personally think carpenter hill has beautiful view for seeing stars, sunsets, watching the fireworks from tree house, if this center gets built it's destroying all this beauty to Charlton. Charlton does not need an energy storage/data center facility.

Earlier written draft (answers as of October 7, 2026)

Data center. No, this is not a data center. Carpenter Hill Power is a battery storage facility. It stores electricity from the grid and releases it when demand is high. It does not generate power or burn fuel. The only data processed is for monitoring and controlling the operation of the system.

Air, water, and noise. In normal operation the facility gives off no smoke or emissions. Water use details have not been published. The main sound in operation is a steady hum from the cooling units, inverters, and transformers, and the sound study is in progress.

Light and views. A lighting plan has not been published. Night sky, screening, and noise for close neighbors are Community Benefits Plan topics under discussion. The equipment is under 10 feet tall and set back from homes, and existing trees are kept for screening where possible. It is still industrial equipment on a rural parcel.

Taxes. The town is expected to receive standard property taxes or a payment in lieu of taxes negotiated with the town. Tax and assessment research is in progress, and no figures have been published.

How the issues were handled

A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.

  • How much would Charlton receive?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • What substances could be released in a fire or failure?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Will the facility use local water or change the water table?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Will it change the rural character, views, and quiet?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • How loud will it be?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
  • Is this a data center, or could it become one?
    Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.