Showing 5 of 211 source records
Public Community Meeting #1 · July 8, 2026How will you mitigate a lightning strike causing a catastrophic failure? How will you contain fire-water runoff from poisoning the town’s wells? What are your plans for a fire-water pond for the fire department? And if there is no pond, where will the fire department get the water?
Earlier published response
On lightning strike mitigation: We install specialized surge arresters and active grounding grids that meet NFPA 780 lightning protection standards. We are also adding a lightning transient analysis to our electrical safety models to verify the system can isolate and ground a strike without damage.
On fire-water runoff containment: Modern safety protocols for lithium-ion battery fires recommend letting a single contained cabinet burn out rather than spraying huge amounts of water. In past industry incidents, the firefighting water itself, not the fire, created contaminated runoff. If the fire department must use water to cool adjacent units, a continuous concrete foundation and a lined drainage swale will capture and contain the runoff for safe disposal.
On the water supply and fire pond: Siting a battery system under NFPA 855 does not require a dedicated fire-water pond on site. We are coordinating directly with Charlton Fire Chief Rob Barton to determine the exact water supply, dry hydrant, and equipment needs. If required, we will construct a dedicated cistern or dry-hydrant connection point at the developer's expense.
How the issues were handled
A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.
- Where will firefighters get water? Will there be a fire pond?
Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed. - How will a lightning strike be kept from causing a fire?
Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Website and email · Submission date not confirmedWhat are your plans for building a fire water supply pond for fire protection?
Earlier written draft (answers as of October 7, 2026)
The fire water supply is being planned with the Fire Chief and will be part of the Emergency Action Plan. Charlton Fire has confirmed there is no hydrant system at the site. Options include storing water at the site to match what fire trucks can deliver. A pond is not part of the current design. Extending town water to the site is not in the current design or the draft Community Benefits Plan.
How the issues were handled
A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.
- Where will firefighters get water? Will there be a fire pond?
Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Website and email · Submission date not confirmedIf you will not be building a fire water supply pond, then where will the Charlton Fire Department get the fire water needed to respond to a catastrophic fire?
Earlier written draft (answers as of October 7, 2026)
Water would come from the supply arrangement being planned with the Fire Chief. Options include water stored at the site and water brought in by fire trucks. Charlton Fire has said water would be trucked in, and that extending the water line from Route 169 is something the town could consider. That is the town's decision, and it has not been made. The planned response to a battery unit fire is also defensive: protect the surroundings and monitor the air while the unit burns out, with water used to cool neighboring equipment and not sprayed on the burning unit.
How the issues were handled
A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.
- Where will firefighters get water? Will there be a fire pond?
Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Website and email · August 4, 2026Where will sufficient firefighting water come from in a town without a comprehensive public-water system?
Earlier written draft (answers as of October 7, 2026)
This is one of the central design questions in the current emergency planning work. Options under discussion include on-site water storage and equipment matched to how the Charlton Fire Department operates, such as tanker capability. The answer will be documented in the emergency management plan and the site design, both subject to independent review.
How the issues were handled
A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.
- Where will firefighters get water? Will there be a fire pond?
Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.
Website and email · Submission date not confirmedMy street has no town water. How would firefighters get water for a fire?
Earlier written draft (answers as of October 7, 2026)
Firefighting water would be needed at the site, not on your road. We have committed to capture firefighting water on site, on a hard surface, so it cannot reach groundwater. We have also committed to plan the fire water supply with the Fire Chief. Storing water at the site to match what fire trucks can deliver is one option. Charlton Fire has confirmed there is no hydrant system at the site and that water would be trucked in, or the town could consider extending the water line from Route 169. That is the town's decision and it has not been made.
How the issues were handled
A written response is recorded. Sending an individual reply, considering feedback, and making a design change require separate evidence.
- Where will firefighters get water? Will there be a fire pond?
Individual reply: not confirmed. Consideration: not recorded. Design change: not confirmed.